SYSTEM GUIDE / SCOTT BADER CRYSTICROOF® PREMIER

A Premier GRP roof is
a controlled laminate.

CrysticROOF® Premier combines Premier resin, glass reinforcement, an isophthalic topcoat and a defined installer route. Deck design, catalyst control, laminate continuity and pre-formed trims all remain part of the waterproofing system.

EARLY SELECTION VIEWDECK → LAMINATE → TOPCOAT
01DECKSPECIFIED OSB3 BUILD-UP
02LAMINATEPREMIER RESIN + CSM
03FINISHISOPHTHALIC TOPCOAT
04PROJECT ROUTEAPPROVED INSTALLER

The system is installed in dry conditions. Catalyst, temperature, reinforcement weight and guarantee requirements must follow current Scott Bader documentation.

SYSTEM TYPECold-applied reinforced GRP
SERVICE ROUTEUp to 25 years*
FIRE ROUTEB_ROOF(t4)*
DETAILINGPre-formed GRP trims
THE PREMIER SYSTEM

Resin alone does not make a GRP roof.

The waterproof layer is created by consolidating glass reinforcement into the catalysed Premier resin and completing it with the specified topcoat. Every deck joint, edge, corner, outlet and wall junction has to preserve that laminate continuity.

01 / BASE

CrysticROOF® Premier Resin

The catalysed polyester resin forms the structural laminate when fully wetting and bonding the specified chopped strand mat.

02 / REINFORCEMENT

CSM and woven tape

Chopped strand mat creates the field laminate, while woven reinforcement supports continuity across board edges, trim joints and local details.

03 / FINISH

Premier Isophthalic Topcoat

The dedicated topcoat provides the exposed finished surface and long-term weathering performance within the Premier build-up.

04 / DETAILS

GRP trims and ancillaries

Drips, raised edges, wall fillets, flashings, corners, angles, flat sheets and movement profiles form repeatable roof geometry before lamination.

CHOPPED STRAND MATTING / REINFORCEMENT WEIGHT

The mat weight defines the laminate—not just the roll.

Lighter matting helps form controlled local details, while the specified field reinforcement creates the main waterproof laminate. Weight, number of layers and resin consumption must follow the selected system route.

01DETAIL MATTING

225 g/m² CSM

Lightweight chopped strand matting for local laminating, tighter corners, returns and complex small-radius details where a heavier mat is difficult to form.

225 g/m²Local detailsCorners + returnsNot a Premier field-laminate substitute
02FIELD LAMINATE

450 g/m² CSM

Standard field reinforcement used within the documented CrysticROOF® laminate route when correctly wetted out and consolidated with the specified resin.

450 g/m²Single-layer Premier route*Rapid wet-outFull consolidation required
03HEAVIER LAMINATE

600 g/m² CSM

Higher-weight field reinforcement for the stronger Premier laminate route and projects requiring the corresponding manufacturer guarantee build-up.

600 g/m²25-year Premier route*Alternative · 2 × 450 g/m²*Higher resin demand

225 g/m² matting is shown as a practical detailing material in the supplied range; it is not presented as the main CrysticROOF® Premier field laminate. Scott Bader documents the Premier field build-up using 450 g/m² and 600 g/m² CSM. Final reinforcement, layer count, resin coverage and guarantee route must follow current controlled system documentation.

PREMIER INSTALLATION LOGIC

Deck, detail, laminate, finish.

The field area is only one part of the roof. The completed system depends on the preparation and continuity of every interface.

  1. 01
    Confirm the roof design

    Check the structural deck, falls, drainage, supports, joints and whether the Premier guarantee and fire route are required.

  2. 02
    Install and align trims

    Select each profile by working dimension, form the perimeter and wall details, then prepare joints for reinforcement.

  3. 03
    Control resin and catalyst

    Measure catalyst against the current temperature guidance and work within the available cure window.

  4. 04
    Wet out and consolidate the CSM

    Create a continuous laminate without dry fibres, trapped air, weak laps or loss of reinforcement through corners.

  5. 05
    Complete the Premier topcoat

    Apply the specified finish at the required coverage and verify continuity, weather protection and handover documentation.

CHECK BEFORE SELECTION

Premier performance depends on installation control.

01Is the deck completely dry?

Scott Bader requires GRP installation in dry conditions; wet decking or laminate must be fully dried before work continues.

02Which laminate and guarantee route?

Reinforcement weight, installer approval and guarantee documentation must be agreed before materials are selected.

03Do the trims match the geometry?

The profile code and both working dimensions need to suit the fascia, gutter, wall or adjoining roof detail.

04Are catalyst and temperature controlled?

Catalyst addition, material temperature and working time directly affect cure and final quality.

OFFICIAL TECHNICAL INFORMATION

Guidance here. Controlled documents there.

This page explains practical selection and system logic. Current technical data sheets, certifications and manufacturer requirements remain controlled by the system manufacturer.

TECHNICAL SCOPE NOTE

*Service-life, guarantee and fire-performance claims shown are manufacturer system routes and remain subject to the specified build-up, approved-installer requirements, reinforcement, current certification and completion of the required documentation. This page is practical guidance, not a project specification or installation manual.